欢迎访问现代地质!

现代地质 ›› 2009, Vol. 23 ›› Issue (3): 545-552.

• 工程地质学 • 上一篇    下一篇

基于GIS的滇藏铁路丽江—香格里拉段工程地质条件分区研究

郭长宝1,2,张永双1,蒋良文3,石菊松1,王科3,孙元帝2   

  1. 1中国地质科学院 地质力学研究所,北京100081;2建设综合勘察研究设计院,北京100007;3中国中铁二院工程集团有限责任公司,四川 成都610031
  • 收稿日期:2009-02-23 修回日期:2009-04-30 出版日期:2009-06-20 发布日期:2011-12-21
  • 作者简介:郭长宝,男,博士研究生,1980年出生,地质工程专业,主要从事工程地质和灾害地质的研究工作。E-mail:guochangbao@163.com。
  • 基金资助:

    中国地质调查局项目(1212010541404);铁道部科技研究开发计划项目(2008G027-D)

Research on Geo-engineering Conditions of the Lijiang-Shangri-La Railway Section of the Yunnan-Tibet Railway Based on the GIS Method

GUO Chang-Bao1,2, ZHANG Yong-Shuang1, JIANG Liang-Wen3, SHI Ju-Song1,WANG Ke3,SUN Yuan-Di2   

  1. 1Institute of Geomechanics, Chinese Academy of Geological Sciences, Beijing100081,China;2. China Institute of Geotechnical Investigation
    and Surveying, Beijing100007,China;3. China Railway Eryuan Engineering Group Co Ltd, Chengdu,Sichuan610031,China
  • Received:2009-02-23 Revised:2009-04-30 Online:2009-06-20 Published:2011-12-21

摘要:

结合滇藏铁路丽江—香格里拉段的线路比选问题,在综合分析区域地质背景、地形地貌、工程地质岩组、斜坡结构、地质灾害发育现状、地壳稳定性、人类工程活动、降水量、距沟谷的距离等指标因素的基础上,通过专家打分建立了层次分析结构模型和数学模型以及计算工程地质条件指数的公式,并计算了各影响因子的权值,同时基于ArcGIS 92 平台进行了工程地质条件分区。计算结果显示研究区工程地质条件以中等和较差为主,基于工程地质分区结果和实际资料分析,对丽江至香格里拉段线路的丽江南部段进行了优化。研究结果对指导研究区进行重大工程建设和规划具有指导意义。

关键词: 层次分析法, 地理信息系统, 工程地质条件评价, 铁路选线, 滇藏铁路

Abstract:

 According to the geo-engineering problems in the alternative lines of the Lijiang-Shangri-La railway section of the Yunnan-Tibet railway, the paper comprehensively analyzed the factors of the regional geological setting and topography, the rock group of engineering geology, the slope structure, geo-hazards developing status, the earth’s crust stability, the human engineering activities, the precipitation and the distance to the valley, and established the analytic hierarchy process (AHP) and mathematical models according to the expert scoring. The paper established the computational formula of engineering geological condition index and calculated the impact factor weights, and made the engineering geological condition zoning based on the ArcGIS 9.2 platform. The calculation results show that the engineering geological conditions are mainly poor and medium in the study area. Based on the results of the engineering geological zoning and real data analysis, the paper made optimization of the southern segment of Lijiang-Shangri-La railway line. The research methods and conclusions in the paper are of good guiding and reference to the construction and planning of the project in the study area.

Key words: analytic hierarchy process (AHP), geographic information system (GIS), engineering geological evaluation, railway route selection, Yunnan-Tibet railway