欢迎访问现代地质!

现代地质 ›› 2009, Vol. 23 ›› Issue (3): 569-574.

• 技术方法 • 上一篇    

勘探剖面二维坐标系向三维坐标系转换的新方法

李光强1,2,陈爱民1,邓敏1,李姣姣1   

  1. 1中南大学 信息物理工程学院,湖南 长沙410083;2矿山空间信息技术国家测绘局重点实验室,河南 焦作454003
  • 收稿日期:2008-09-20 修回日期:2009-04-16 出版日期:2009-06-20 发布日期:2011-12-21
  • 作者简介:李光强,男,博士,1972年出生,地图制图学与地理信息系统专业,主要从事矿山三维建模与空间数据挖掘相关的研究与教学工作。E-mail: ligq168@163.com。
  • 基金资助:

    矿山空间信息技术国家测绘局重点实验室项目(KLM200824);辽宁工程技术大学地理空间信息技术与应用实验室开放基金项目(2007001)

A New Transformation Method of Exploratory Profiles from 2D to 3D Coordination Systems

LI Guang-Jiang1,2,CHEN Ai-Min1, DENG Min1, LI Jiao-Jiao1   

  1. 1School of Info-physics and Geomatics Engineering, Central South University, Changsha, Hunan410083,China;
    2Key Laboratory of Mine Spatial Information Technologies, State Bureau of Surveying and Mapping, Jiaozuo, Henan454003, China
  • Received:2008-09-20 Revised:2009-04-16 Online:2009-06-20 Published:2011-12-21

摘要:

勘探剖面是矿山设计、生产过程中的基础性成果图件,在矿山三维建模中发挥着重要作用,其中勘探剖面从二维坐标系向三维坐标系的转换及其误差分析、校正是矿山三维建模的一个重要环节。针对当前人工或交互式勘探剖面坐标系转换过程存在费时费力、易出错等问题,在基于基准点的勘探剖面坐标系转换原理的基础上,首先探讨了基于地质体断面面积标准差的转换误差评价方法;然后,提出了基于转换域的勘探剖面坐标系转换的新方法,详细叙述了算法的计算步骤,并分析了算法的复杂度;最后,以湖南省某金属矿山为例,对比分析了勘探剖面坐标系转换的质量,并验证了所提方法的可行性。

关键词: 勘探剖面, 坐标系转换, 基准点, 转换域

Abstract:

As the important achievements in the mine designing and producing processes, the exploratory profiles are very significant for modeling the threedimensional mine. The transformation of the profiles from 2D to 3D coordination systems, and the evaluation and emendation of transformed errors are important. For reasons of complicated work of traditional transformation, this paper promotes a new method to transform the coordination of the profiles. Based on the standard deviation of section area of the geological entities, an evaluation of the transformed error is put forward. Then, the method to assess the error is investigated, and a transforming-domain based algorithm to transform the coordination of the profiles is proposed, the algorithm and its complication are depicted in detail. Finally, a practical example which uses the profiles of a metal mine in Hunan Province shows that the method proposed in this paper is feasible, and the transforming result is better than that based on the single benchmark.

Key words: exploratory profile, coordination transformation, benchmark, transforming domain

中图分类号: